Kingsburg

MRB Contracting, Kingsburg Nova Scotia, modern architecture

25 Oct Kingsburg 2: beams & bunkhouses

  Our Kingsburg projects have been moving right along. This week the team has made great strides towards getting Kingsburg 2 ready for framing. After all the piers were poured it was time to connect some of the dots. The six big round piers on the top side of the hill are for the bunkhouse. The bunkhouse was sheathed with exposed v-groove pine which will be completely painted in white. Inside the bunkhouse there will be an L-shaped mezzanine for a play area with the living space below. The walls for the bunkhouse were build on the floor and then raised into position.   And while the project changes day by day, the view remains the same. Breathless. There are tractor operators and there are tractor operators. Kevin gently placed each of these half tonne beams in place with deft skill. Each beam was attached to the concrete piers and concrete walls using large anchor bolts. Here Smitty drills the holes with a hammer drill. Then he'll fill the hole with a fast setting two part epoxy and hammer in the bolts. Once the epoxy sets there's no getting the bolts out. The beams are then safely secured. The next step was to install the sill plate on...

Read More
MRB Contracting, modern architeture, framing, Kingsburg Nova Scotia

15 Oct It’s a house! : Kingsurg 1

Indeed it is a house. The guys have finished framing the exterior of the home and finally we can get a sense of its shape.     This of course, is only the beginning. The exterior must be water proofed and clad with a modern finish. Then there's the roof, windows, doors, electric, plumbing...

Read More
KIngsburg, MRB Contracting, modern architecture

11 Oct Kingsburg 1 & 2 updates: Oct 11th

After the long Thanksgiving weekend it was time to get back down to Kingsburg. Both projects are moving along nicely. The guys have sheeted the walls and part of the roof on Kingsburg 1. Today the rafters were installed. The place will be completely framed in a few days. The shot above is from the field. If you go back three weeks in our build timeline you'll notice a big difference. This is a closer photo from the same direction. The room on the right side of the photo will offer the homeowners a gorgeous ocean view. Below you can see the big beam the spans the length of the house. You can also see that some of the hangers for the rafters have been installed at the top of the roof line. A view from inside looking out towards the ocean. This photo was taken just outside the kitchen area of the home. The living room will be fitted with big windows -giving the residents the feeling of being outside. Below is the profile of the home as seen from Beach Hill Road. Bossman Smitty takes a moment after lunch to review the progress. It's been cold and rainy the last few days hence the...

Read More
MRB Contracting, Kingsburg, framing, modern homes

01 Oct Kingsburg 1: Framing begins

Rain can definitely stall outdoor projects at this time of year. And with the flooding that's been happening in parts of the Province it's clear that we've had plenty of it. And yet at MRB Contracting rain is not a deterrent to getting things done. The guys have been busy with beginning the framing at Kingsburg 1.   [caption id="attachment_1126" align="aligncenter" width="510"] ...

Read More
MRB Contracting, Kingsburg, Halifax, Nova Scotia

24 Sep Kingsburg 1: Beams

And the work continues on Kingsburg 1. The beams connecting the concrete piers to the ICF walls went up last week. There's hardly a nearby place to get a cup of coffee around the job site. If anything we are self reliant. Where in the world is Kingsburg anyway? Kingsburg is a coastal community located about 130 kilometers from Halifax. Like many other coastal towns, fishing was a primary source of income for residents for many decades. With the decline of the Atlantic fisheries, the town has changed demographically. With two beaches, three lakes, and hiking trails, it has become a summer vacation spot. We are fortunate to work in such a pictureque location. Scott isn't taking it for granted as he inspects his beam installation. ...

Read More
MRB Contracting, concrete

20 Sep Kingsburg 2: what there are 2?

What we didn't tell you? It's true. We've been commissioned to build two homes on adjoining lots. And although the early photos of the foundation work may look similar, the two homes are completely different on the outside. Both foundations feature ICF walls and Form-A-Drain technology. Both are modern homes - designed by architects specifically for each client. Both overlook the majestic North Atlantic. [caption id="attachment_970" align="aligncenter" width="510"] The quintessential MACK Truck concrete mixer in a red and yellow colorway.[/caption] [caption id="attachment_974" align="aligncenter" width="510"] It's not quite like looking down the barrel of a gun. But anyone at the end of this slide feels a sense of urgency to get the job done.[/caption] [caption id="attachment_971" align="aligncenter" width="510"] Caption contest photo. Comments are open.[/caption] [caption id="attachment_975" align="aligncenter" width="510"] Who says you can't push a loaded wheel barrel with style?[/caption] [caption id="attachment_973" align="aligncenter" width="510"] Scott moves material while Andrew and Rob deliberate about some final details.[/caption] [caption id="attachment_976" align="aligncenter" width="510"] The boys take the time to screed the concrete to get it level. This step is key in ensuring that the ICF walls, and everything else that goes above for that matter, remains level and true.[/caption] Wow. There is a lot happening down in Kingsburg. Stay tuned as we...

Read More
MRB Contracting, Kingsburg, concrete forms

13 Sep Kingsburg 1: cured concrete & waterproofing

[caption id="attachment_921" align="aligncenter" width="510"] At the moment it's hard to see much. But not for long![/caption] The team returned to Kingsburg 1 to find soggy ground but no damage from Hurricane Leslie. So we set to work on removing the bracing from the ICF walls that we'd installed before pouring concrete. [caption id="attachment_919" align="aligncenter" width="510"] Rob likes working with concrete. He was looking forward to removing the forms to see what the piers looked like.[/caption] Just another day at the MRB office - building modern living in timeless viewscapes. [caption id="attachment_918" align="aligncenter" width="510"] Rob removed the bottom two thirds of each form -leaving the top sections braced. This will help the piers remain stable while we back fill the holes to the finished grade.[/caption] [caption id="attachment_920" align="aligncenter" width="510"] Here's a close up of the wood grain left on a concrete pier after the plywood form was removed.[/caption] [caption id="attachment_917" align="aligncenter" width="510"] The exterior of the ICF is waterproofed -first a membrane which seals the walls from the top down to the outer edge of the footing.[/caption] [caption id="attachment_922" align="aligncenter" width="510"] The second and final layer of waterproofing is a semi-rigid plastic sheeting called dimple board. The dimpled surface allows air flow between the two barriers. [/caption] [caption...

Read More
MRB Contracting, Kingsburg NS, modern home, ICF walls, concrete forms

10 Sep Kingsburg 1: Preparing for Leslie/ concrete work

[caption id="attachment_884" align="aligncenter" width="510"] Thursday Sep 6th forecast[/caption] We are in the midst of Atlantic  hurricane season. Hurricanes tend to dissipate or veer off before they reach the Maritimes. But it's not always the case and being prepared is part of being a Maritimer. And so it was that we found ourselves staring down a giant red blob heading our way. By Thursday, most weather forecasters were sure we'd get a "direct hit." Without wasting any time the team worked hard to get the ICF walls in place and braced for concrete. The ICF walls create the foundation for the front of the home. The rest of the home rests on 9 concrete piers. We fabricated  concrete forms for the piers and erected and braced them for concrete. The concrete and pump trucks arrived in the nick of time. By days end our project was ready for whatever Leslie had to offer. [caption id="attachment_888" align="aligncenter" width="510"] Smitty and Scott debriefing on the installation technique[/caption] [caption id="attachment_896" align="aligncenter" width="510"] This photo shows the ICF wall and 9 piers braced and ready for concrete.[/caption] It's hard to imagine what the house will look like at this point. So stay tuned for more. This week we will be...

Read More
IMG_1330

06 Sep Kingsburg 1: building a foundation

The Kingsburg 1 project is off to a great start. With clear sunny skies the team laid out foundation footings and poured the concrete before day's end. For this project we used a technology called Form-a-drain. What is Form-a-drain? Form-a-Drain forms precise foundation footings, with an ideally located foundation drainage system above the bottom of the footing and below the foundation wall. The system allows for simple adaptation to function as an effective means for radon reduction since it forms a complete loop around the foundation. Not only do the building blocks provide drainage, but they also reduce our use of building materials by combining concrete forms and drainage into one step. Effectively, this system is lower impact and has a longer lifecycle than traditional methods. [caption id="attachment_850" align="aligncenter" width="510"] Rob and Scott laying out the footings.[/caption] [caption id="attachment_855" align="aligncenter" width="510"] Drainage leading the water towards the sea.[/caption] [caption id="attachment_911" align="aligncenter" width="380"] Smitty and Burns taking care of business.[/caption] [caption id="attachment_912" align="aligncenter" width="510"] All done and ready for the ICF wall installation[/caption] And did we mention the view? This will be our office for the next few months. We can't wait to show you how it develops. ...

Read More
side view

04 Sep Sawhorses

The almighty sawhorse. Backbone for umpteen projects. Perhaps you can tell the skill of a craftsman by the sawhorses he builds. Here we have Andrew building 8 in a row for our Kingsburg projects. [caption id="attachment_836" align="aligncenter" width="510"] Compound angles and counter sunk screws.[/caption] [caption id="attachment_837" align="aligncenter" width="510"] 2 screws should do it and construction adhesive.[/caption] [caption id="attachment_832" align="aligncenter" width="510"] Lightweight, stack-able and versatile. What else do you want from a sawhorse?[/caption]...

Read More