Clifton St | Windows

image

06 May 2014 Clifton St | Windows

Share on FacebookTweet about this on TwitterShare on Google+Email this to someone

There was excitement in the air for the much anticipated arrival of the Clifton Street windows. The team were on site early to unload the 28 Accurate Dorwin Triple pane fibreglass windows. In keeping with MRB philosophy, these windows are incredibly energy efficient and offer substantially low U- values.
They commenced work immediately, meticulously installing several of the windows following the MRB window installation procedures as we detailed in a previous blog post. As each window is installed the team are able to move forward with the exterior finish of cladding. While there are many steps in this installation process, each plays a vital role in the functionality of the final build. As usual, Smitty and the team practice their craftsmanship and attention to every detail.

image

image
image
image
image